Published by Electrotek Concepts, Inc., PQSoft Case Study: Harmonic Resonance Evaluation for Feeder and Substation Capacitor Banks, Document ID: PQS0706, Date: July 27, 2007. Abstract: A utility operates feeder and substation capacitor banks on a 25.56kV distribution feeder. The utility uses frequency scan simulations to determine the effect of distribution feeder and substation capacitor banks onContinue reading “Harmonic Resonance Evaluation for Feeder and Substation Capacitor Banks”
Tag Archives: Feeder
Feeder Lightning Transients
Published by Electrotek Concepts, Inc., PQSoft Case Study: Feeder Lightning Transients, Document ID: PQS1101, Date: March 15, 2011. Abstract: Lightning strokes to exposed utility transmission or distribution circuits can inject a significant amount of energy into the power system in a very short time, causing deviations in voltages and currents which persist until the excess energyContinue reading “Feeder Lightning Transients”
Distribution Feeder Wind Turbine Generator Analysis
Published by Electrotek Concepts, Inc., PQSoft Case Study: Distribution Feeder Wind Turbine Generator Analysis, Document ID: PQS1206, Date: January 26, 2012. Abstract: This case study presents a distribution feeder wind turbine generator analysis. The investigation included several potential causes of turbine and feeder overcurrents and overvoltages, including wind speed variations, cut-out and cut-in switching operations, groundContinue reading “Distribution Feeder Wind Turbine Generator Analysis”
Monitoring Objectives and Screening Procedures – Distribution Feeder Capacitor Bank Application
Published by Electrotek Concepts, Inc., PQSoft Case Study: Monitoring Objectives and Screening Procedures – Distribution Feeder Capacitor Bank Application, Document ID: PQS0708, Date: January 1, 2007. Abstract: Power quality problems encompass a wide range of disturbances and conditions on utility and customer power systems. They include everything from very fast transient overvoltages to long duration outages.Continue reading “Monitoring Objectives and Screening Procedures – Distribution Feeder Capacitor Bank Application”
Isolating An Underground Cable Failure
Published by Charlie Williams, Senior Systems Consultant, S&C Electric Company