Energy Usage Report for A Small Office Facility

Published by Thaweesak Aranchot, Electrical Engineer, Power Quality (Thailand) Co., Ltd.

Plan

  • Measure actual usage of each load for recording a consumption. Then determine a way to reduce the usage without impacting a business efficiency
  • Investigate the actual data comparing with Electricity bill

Introduction

  • The energy consumption at PQT was studied to determine\how much energy was used, where it is being used, and how much it costs.
  • Dranetz HDPQ Xplorer was setup for monitoring the usage at the main board of small office facility. EP1 was setup for determining an individual load.
  • Then investigate an energy usage and compare with a MEA electricity bill to determine the exact energy usage and cost.

Loads of the Building

Figure 1:

  • A main of air Conditioner is set as 25 degree.
  • Operate continuously 9 hours.
  • The usage is 18.8 kWh on working day

figure1Figure 1

Figure 2:

A trend plot is showing a usage of two 36-watt fluorescent lamps in an hour.

18W x 12 – Consumed à 2.94 kWh/Day

36W x 4 – Consumed à 3.83 kWh/Day

Total = 6.77 kWh/Day

figure2

figure2-2

Figure 2

Figure 3:

  • A full day used 1.29 kWh without opening a door.
  • The usage will be 1.77 kWh per day if disturbs refrigerator operating.

figure3Figure 3

Figure 4:

  • Water pump usage is operated for part time.
  • Trend plot displays an hour usage of a water pump.

figure4Figure 4

Blue area is operating area

Green area is non-operating area

Figure 5:

  • Office equipment: computer, router, printer, and CCTV.
  • Illustration is a consumption of Printer
  • Consumption is 2.35 kWh per Day

figure5

Figure 5

Blue area is operating area

Green area is non-operating area

A Consumption for Working Day

Load consumption of a working day in Percentage.

Average consumption is 30 kWh per day.

pie_chart

Figure 6:

  • Trend plot is displaying a business day usage for all loads in the office.
  • A business day usage is 31.3 kWh for per day

figure6Figure 6

Figure 7:  Working day usage between middle of December to middle of January.

figure7

Figure 7 – Working day consumption

A Consumption for Non-Working day

Display a single day usage for Non- Working day (Figure 8)

  • A day off usage is about 8 kWh
  • There are kinds of load that always run all times such as CCTV, security lights, router, refrigerator.

 

figure8

Figure 8

Figure 9: Non-working day usage between December 2018 to January 2019

figure9Figure 9

Total Consumption (Figure 10)

  • Electricity bill displays monthly usage during December 14, 2018 and January 14, 2019.
  • Total cost is 3,323.54 THB including vat, service charge and FT factor.

 

figure10

Figure 10

Solutions: How can we save cost of electricity?

Saving cost, we could reduce electricity of the main load for example:

  • Air conditioner: Typically, higher temperature can be able to reduce energy usage by decreasing 10% of usage. (Table below)

table

  • Clean an air filter regularly for saving 10% of the air conditioner consumption.
  • Reduce an operation time of air conditioner for an hour that can be able to reduce 10 % of Air conditioner usage. (Credit: Analysist energy management book for small and medium business, December 2012, Ministry of Energy, Thailand.)
  • Install an insulation on wall or ceiling to reduce temperature inside that allow the air conditioner work less than high temperature. (Credit: Department of Energy, United State of America.)

We could reduce electricity of load for example, Lighting:

  • Fluorescent lamp can be replaced with LED lamp to reduce energy usage.
  • A LED lamp costs 400 THB and owner will get back in 12.7 month.

Electric Vehicle Charger

Published by Terry Chandler, Director of Engineer, Power Quality Inc.

Power Quality study for EV charger post
• Manufacturer of EV has experienced several internal battery charger failures in new EV’s
• 2 sites, 1 in Arizona USA, 1 in Seoul, Korea.

ev_post car

The plan for USA site and Korea site
• Monitor the voltage quality supplying the charger post.
• Monitor the Voltage quality and current load of the EV internal battery charger
• Record all voltage quality parameters
• Record all load factors including
• Switching
• Harmonics
• Peak currents

Charging post details
FAST CHARGING – 7.7kW of power to charge your vehicle quickly
• QUALITY – Technology that works for the life of your current plug-in vehicle and then some
• CONVENIENT – 25 feet of charging cable for installation and operation flexibility
• DURABLE – Rugged, fully sealed NEMA 4 enclosure for installation anywhere

power charger

Electrical specifications of charging post
• Service – 208V to 240V – 40A, dedicated circuit
• Charge current output power – 208V to 240V – 32A max
• Service ground monitor – Constantly checks for presence of proper safety ground
• Automatic circuit recloser after minor power faults
• Charge Circuit Interruption Device – Ground fault protection with fully automated self-test, eliminates manual user testing

Charging post normal operation
Normally, the vehicle will immediately request a charge using a special communication line in the cable. Within a few seconds the green “Charging” light on the face of the HCS will turn on and the charging cycle will begin.
After an average driving day the vehicle battery pack will require several hours to recharge completely. Charging overnight is the most convenient way to maintain healthy batteries and ensure the vehicle’s full range will be available for the next day.

The front panel on the HCS has four indicators:

  • Power (yellow) indicates that power is available to the HCS.
  • Charging (green) indicates that the vehicle is requesting a charge and AC power is currently applied to the vehicle.
  • Power Fault (red) indicates that the HCS is not wired correctly. The problem can be due to improper grounding or a missing Earth Ground. The wiring should be examined by a qualified electrician.
  • Charging Fault (red) indicates that the HCS is unable to communicate with the vehicle correctly, or a safety fault condition has been detected by the unit. 

figure1 fron panel

Figure 1

Installation at the USA Test Setup
• Weather conditions, 105 to 120 degrees F.
• HCS Maximum Operating Temperature: -30°C to +50°C (-22°F to +122°F)
• Two cars were used for testing
• Dranetz HDPQ Explorer with 3 range Flexi CTs for recording voltage and current
• Channel A was connected to the 208V input to NCS-40 charger control panel.
• Channel C was connected to a test cable from the charger to the car.
• Installed 1 each Dranetz PowerVisa PQ monitor at Charging post B.

dranetz monitor

dranetz monitor2

Dranetz HDPQ monitor connected to incoming voltage of charger post.

connection from charger

Connection from Charger pedestal to EV.

Tests and monitoring included
• Input and output voltage and current of NCS not attached to car.
• Input and output voltage and current of NCS when attached to car and while charging
• Input and output voltage and current when connecting and disconnecting from car.
• Input and output voltage and current when connecting a second charger to a second car.
• Several repeats of these items

io voltage

Figure 2: Input and output voltage of NCS when attached to car and while charging.

Test results 
Input/output with an EV car not connected.
208-volt source voltage waveform from facility source was stable and within normal tolerance of +/-5%; frequency 60.0 hertz
No current and no 208-volt output. Small square wave output for signaling to EV car

Input/output with car connected.
• Output voltage delayed until car charger signal
• Output current delayed and slowly ramps up. More details needed. But apparent “soft start”
• Amazingly fast voltage transient recorded during connection time
• Voltage dropped when charging started.

Input/output during charging switching off
•When charger shuts off, voltage transient.

peak of rms voltage

rms voltage and peak

Harmonic voltage and current with charger on and off

harmonics

harmonics2

Input/output during connection of second car
• Voltage dropped further when second car connected.
• No noticeable transient when second car connected.
• Harmonic voltage distortion increase…..

Change instrument setup to provide better details for inrush current.
• During connection to car and intermittent connection was observed. This may be a contributing factor. Further investigation required

Monitoring Vrms during charger testing long term graph show voltage surge during the charger connection test. No voltage sags occurred. (Figure 3)

monitoring vrms

Figure 3

Voltage rise during test not due to testing of charger post or charger (Figure 4).

voltage enabled by evs

Figure 4

Source voltage variations with charger off (Figure 5).

connect to evs not charging

Figure 5

Source voltage transient to charger post (Figure 6).

voltage graph rms soure

Figure 6

RMS Voltage variations due to charger operation (Figure 7).

rms voltage variations

Figure 7

Harmonics charger on (Figure 8).

harmonics charger on

Figure 8

Harmonics charger off (Figure 9).

harmonics charger off

Figure 9

Summary
• Source voltage is fed direct to EV charger without filtering, regulation or surge protection.
• Harmonics increase when EV charger comes on is dependent on the source impedance and will vary site to site.
• The EV chargers are at risk to damage due to source voltage PQ events.
• Not all source voltage PQ issues are from the utility
• Some charger sites have transient voltage surge suppression.
• The EV charger loads will vary by EV manufacturer. Tested units showed charger current and supply voltage from the charger post are controlled by the EV charger.
 

PQSynergy™ Papers 2019

PQSynergy™ is an international forum to share experiences, requirements, questions, information, customer requirements, problems and solutions in the fast growth area of quality of supply requirements of sensitive loads, energy conservation and management and power quality monitoring and solutions. 

For more information, you can visit the website: www.pqsynergy.com

View and download papers:

PQSynergy™ PapersPublishers
A Case Study for Energy Usage ReportThaweesak Aranchot, Electrical Engineer
Power Quality (Thailand) Company., Ltd.
Challenge in Solar Rooftop PVMayura Srion, Chief of Power Quality Analysis Section, Customer Service Division
PEA Udon Thani 1, Thailand
Challenges with integrating PV into MV gridThomas Pua, Senior Product Development Engineer, Power Standards Lab, USA
Distributed Energy Storage System (ESS) and the GridKerk See Gim, Senior Manager, Power Automation, Singapore
Power Generation and Air PollutionJay Babin, Managing Director, E-Flow (Thailand) Company, Ltd.
Power Quality Causes and Effects with Biomass Power PlantDanaisak Tangsakha, Chief of PQ Analysis, Customer Service Division,Engineering & Service Department, PEA Nakhon Pathom, Thailand
Power Quality Practitioner™ WorkshopsTerence Chandler, Director of Engineering, Power Quality Inc., USA
PQSim200Robert James Stewart, Electrical Engineer, Power Quality (Thailand) Company., Ltd.
How can Blockchain Technology be used for Electrical Utilities in the futureRobert James Stewart, Electrical Engineer, Power Quality (Thailand) Company., Ltd.
Implementation of Four Lenses of InnovationKittipon Daychosawang, Engineer, Department of Customer Service, PEA Chiang Mai 2, Thailand
Intro to PQDIF and its ApplicationsThomas Szollossy, Senior Technical Support Engineer, Power Quality (Thailand) Company, Ltd.
Introduction to IEC 61850James Mater, General Manager, Smart Grid, Quality Logic Inc., USA
Leadership is . . . Probably Not What You Think It IsEric Stojkovich, President, ESC Pacific Inc., USA
Power Quality Techniques for Crushing Plant SolutionsSuwipha Kittitanapisarn, Chief of Power Quality Analysis Section, PEA Chiang Mai, Thailand
PQMS at Con EdisonTerence Chandler, General Manager, Dranetz Asia, Dranetz Corporation
PQSynergy™ Papers 2019

PQSynergy™ Papers 2018

PQSynergy™ is an international forum to share experiences, requirements, questions, information, customer requirements, problems and solutions in the fast growth area of quality of supply requirements of sensitive loads, energy conservation and management and power quality monitoring and solutions. 

For more information, you can visit the website: www.pqsynergy.com

View and download papers:

PQSynergy™ PapersPublishers
30 Years of History of PQ in Asia (And the World)Terry Chandler, A Power Quality PractitionerTM , Director of Engineering, Power Quality Thailand LTD/Power Quality Inc. USA
Active Harmonic Mitigation-What the Manufacturers Don’t Tell You!Tony Hoevenaars, PEng., MIRUS International Inc.
Generating Electricity Through Incineration, Opportunity or Threat for
Thailand
–
New Issues and Opportunities for Power QualityWilliam (Bill) Howe, Program Manager
Power Quality Research, EPRI
PQ Standards IEEE-519-2014 Applicable for Industrial + Commercial Supply SystemTushar Mogre, TASTM PowerTek
Strategies of Maintenance Management in CCPPPanida Boonyaritdachochai, Paveena Ketwong & Patcharachai Kaewwanna, B.Grimm
Technical Challenges of Remote Access to Instruments Over Mobile NetworkThomas Szollossy, B.Eng (EE), Senior Technical Support Engineer, Power Quality Thailand LTD
Unintended Consequences of DER Penetration in Distribution and MicrogridsStephane Do, Global Product Manager, Power Standards Lab (PSL)
A New Harmonics Option for PQSim200Thaweesak Aranchot, Power Quality (Thailand) Co., Ltd.
Industrial Benchmarking of PQ and Various Methods and Merits Tushar Mogre, TASTM PowerTek
Introducing a PQ Simulator-PQSim200 Power Quality (Thailand) Co., Ltd.
The Opportunities for Battery Storage System in Demand SideJiravan MONGKOLTANATAS, Electrochemical Materials and System Lab (EMS), Materials for Energy Research Unit (MFERU), National Metal and Materials Technology Center (MTEC)
Power Quality in Singapore-The Past One DecadeEr. Muhammad Najmi Bin Bohari, Principal Consultant, Potentia Dynamics, MSc(Power Eng), B.Eng (EEE), P.Eng, ACPE, LEW, MIES, M-CIGRE
PSL Analyzer Products Power Standards Lab (PSL)
Singapore Energy Deregulation and Smart GridPower Automation
Advances in Software for Power Quality Monitoring SystemsBrian W Todd, Vice President, Dranetz Technology, General Manager, Electrotek Concepts
Embedded Systems-The Perfect Solution for Microgrid ControlKeith Houghton, Linklaser Limited
New development of EV and Chargers in ChinaQianlu Yan, Beijing Joint Harvest S&T Co., Ltd.
PEA Microgrid Design for Off-Grid IslandChakphed Madtharad, Ph.D., Smart Grid Planning Division, PEA
PQSynergy™ Papers 2018

Harmonics Analysis using PX5-400 & DV6 Enterprise Software

The Power Xplorer integrates the most advanced feature set available in a power monitoring instrument, with an easy-to-navigate, color graphical user interface. With high-speed sampling and data capture (1 microsecond/channel), this 8-channel workhorse simultaneously captures and characterizes thousands of parameters, using a range of standard and customizable operating modes. The unique measurement capabilities of the Power Xplorer include capture of low-medium-high frequency transients through peak, waveshape, rms duration and adaptive high-speed sampling, as well as power measurements to clearly characterize non-sinusoidal and unbalanced systems.

  • 400Hz Monitoring
  • 7 Monitoring Modes
  • 4 Transient Triggers

Dran-View 6 (DV6) software is included as part of our Dranetz HDPQ instrument packages and is compatible with all current and most legacy portable instruments from Dranetz.

Note: Software upgrade, new version is Dran-View 7 Professional and Enterprise Editions.

Dran-View 7 is a Windows based software package that enables power professionals to visualize and analyze power and energy monitoring data simply and quickly. It is a snap to navigate, delivers automated functionality, and incorporates powerful analytical capabilities and customizable options to meet the needs of each individual user. Dran-View is successfully used by thousands of customers around the world and has become the industry leading power management software tool.

Harmonics Analysis

The user can select from a variety of harmonic calculations and displays in DV6 (Figure 1).

Harmonics analysis using PX-5-400 and DV6_figure1

Figure 1

The graph shows full spectrum (Figure 2), but a user may choose a subset for clarity of data or specific details.

Harmonics analysis using PX-5-400 and DV6_figure2

Figure 2

User can save data as Excel spreadsheet (Figure 3).

Harmonics analysis using PX-5-400 and DV6_figure3

Figure 3

6 Current channels from PX5-400

User selects the channels to be displayed

Harmonics analysis using PX-5-400 and DV6_figure4

Harmonics analysis using PX-5-400 and DV6_figure5

 

PQSynergy™ Papers 2017

PQSynergy™ is an international forum to share experiences, requirements, questions, information, customer requirements, problems and solutions in the fast growth area of quality of supply requirements of sensitive loads, energy conservation and management and power quality monitoring and solutions. 

For more information, you can visit the website: www.pqsynergy.com

View and download papers:

PQSynergy™ PapersPublishers
Electric Vehicle Charger Case StudyTerry Chandler, A Power Quality PractitionerTM , Director of Engineering, Power Quality Inc.
Power Quality and Harmonic Causes and Effects with Paper Mill FactoryDanaisak Tangsakha, PEA Thailand
Power Quality Problem Analysis in VSPPSurawut Bunnag, Chief of Power Quality Analysis Section, Provincial Electricity Authority (PEA Area 3 (Central) Nakhon Pathom)
Proactive Use of PQ Data Beyond Post-Mortem AnalysisBill Howe, PE, Program Manager, Electric Power Research Institute (EPRI)
Robotic Welding in Auto Industry-Case Study Honda CarsPOWER
Synchrophasors for Distribution SystemsThomas Pua, Product Development Engineer, Power Sensors Ltd
Thermal Modeling of Oil Immersed Transformer Using Temperature Rise DataNat Songkram, Power Quality Section,
Provincial Electricity Authority, PEA
Developing an Improved Strategy for Valuing PQBill Howe, PE, Program Manager, Electric Power Research Institute (EPRI)
Electrical Cars and Charging in ChinaQianlu Yan, Beijing Joint Harvest S&T Co., Ltd.
Impact of Power Quality on Rice Mills Provincial Electricity Authority, PEA
Power Quality in Building Services Case Studies & Examples from SingaporeEr. Muhammad Najmi Bin Bohari, Principal Consultant, Potentia Dynamics, MSc(Power Eng), B.Eng (EEE), P.Eng, ACPE, LEW, MIES, M-CIGRE
PQube 3 and Micro Power Quality Power Sensors Ltd (PSL)
Reducing Generator Size and Fuel Consumption using Harmonic MitigationPresident & CEO Tony Hoevenaars, PEng, Mirus International Inc.
Safety Issues Caused by High Earth Resistance and Identifying Them Using InstrumentsThomas Szollossy, Senior Technical Support Engineer, Power Quality Thailand LTD
Secure Network Infrastructure for Mission Critical Data from Utility IoTPeter Larsson, IoTium
Testing Power Quality Meters with the PQSim Training ToolTerry Chandler, Director of Engineering, Power Quality Thailand LTD/Power Quality Inc.
Passive vs Active Harmonic MitigationMirus International Inc.
PQSynergy™ Papers 2017

PQSynergy™ Papers 2016

PQSynergy™ is an international forum to share experiences, requirements, questions, information, customer requirements, problems and solutions in the fast growth area of quality of supply requirements of sensitive loads, energy conservation and management and power quality monitoring and solutions. 

For more information, you can visit the website: www.pqsynergy.com

View and download papers:

PQSynergy™ PapersPublishers
Thailand Integrates Large-Scale Wind FarmsChakphed Madtharad, Ph.D., Provincial Electricity Authority (PEA)
Power Master 3 SeriesJay Babin, Power Quality Thailand LTD
Using Power Quality Data to Troubleshoot Utility AssetsDaniel Sabin, P.E., M.Eng., IEEE Fellow
Principal Engineer & Software Architect, Electrotek Concepts
Design and Evaluation of PV Rooftop system in ThailandAsst. Prof. Dr.-Ing. Boonyang Plangklang, Department of Electrical Engineering, Faculty of Engineering, Rajamangala University of Technology Thanyaburi,, RMUTT Thailand
Introducing a Power Quality SimulatorTerry Chandler, Director of Engineering, Power Quality Thailand LTD/Power Quality Inc.
Solving Customers’ Problems in Harsh EnvironmentSONEL
Advanced Power Quality Monitoring System in Hong KongIr. Y.Y. LEE (MHKIE, MIET) &Nick K.W. CHAN, CLP Power Hong Kong Limited
Grid-Tied PV in Singapore – Power Quality Aspects and Its ChallengesEr. Muhammad Najmi Bin Bohari, MSc(Power Eng), B.Eng (EEE), P.Eng, MIES, M-CIGRE
Who is liable for damage when PQ supply is out of toleranceJay Babin & Itti Mangkornthong,
Power Quality (Thailand) Co. Ltd.
Harmonic in the Modern Industry Auto Parts Industry and Harmonics–
The Harmonic Load of Various Technologies lamps vs Traditional LampsItti Mangkornthong, Power Quality (Thailand) Co. Ltd.
Harmonic Assessment for Cement KilnSuwipha Kittitanaphisarn, Chief of Power Quality Analysis Section, PEA Area 1(North) Chiangmai
Dranetz Commercial MessageBrian Todd, Vice President of Global Sales for Dranetz General Manager of Electrotek Concepts & Daniel Sabin, Principal Engineer & Software Architect, Electrotek
Decentralized Battery Energy Management Systems for Stand-Alone PV-Battery SystemsUmarinSangpanich (PhD.), Faculty of Engineering at Sriracha, Kasetsart University (Sriracha campus)
Ozone Water SystemThai Energy Conservation Co., Ltd
Leveraging Distributed Processing in the Smart GridKeith, Linklaser
Smart Grid for Modern City–
Grid Modernization – a System Operator’s PerspectiveVictor Wong, Sarawak Grid System Operator/Senior Vice-President, Sarawak Energy Berhad
Overvoltage Consideration in Grounding of Distributed GenerationNat Songkram, Power Quality Section, Provincial Electricity Authority (PEA)
Harmonics in Electrical Power Systems – A Major Power Quality IssueBaldev Raj Narang B.Sc. Engineering
(Electrical), CEO Clariant Power System Ltd, Pune India & Co-Author Tushar Deshmukh BE MBA CMD, Clariant Power System Ltd, Pune India
EV Charging in FutureQianlu Yan, Beijing Joint Harvest S&T Co., Ltd.
Thailand EE Policy for Standard and LabelingMr.Watcharin Boonyarit, Senior Scientist
Department of Alternative Energy, Development And Efficiency Ministry of Energy, Thailand
PQSynergy™ Papers 2016

Bank’s High 9’s Infrastructure Saved from Disaster

Published by Dranetz – BMI Case Studies


The power system for this major NYC bank providing nationwide credit card and other financial transactions appeared to be performing satisfactorily. Fortunately, the proactive monitoring approach employed in this facility identified a power quality trend that could have caused a catastrophic failure.

Non-symmetrical waveforms rich with even order harmonics indicate a problem in the power system. The problem was identified as a partial rectification by the UPS of the AC power instead of a full rectification. The UPS would have failed if the system had switched over.

While the bank did not experience any overt power quality problems, monitoring at the input and output of three separate UPS systems identified non-symmetrical waveforms and a trended increased in even-order harmonics. Since this harmonic pattern is indicative of an improperly operated power system, a spectrum analysis was performed. That analysis identified a partial rectification where a full rectification of the AC power should have occurred. Left alone, the UPS would have failed to perform. The UPS maintenance team was quickly brought in to repair the problem and ensure high 9’s reliability.

Bank's High 9s Infrastructure Saved from Disaster