Computer on Shared Branch Circuit

Published by Dranetz – BMI Case Studies


Engineering laboratory adjacent to offices. A computer system used by laboratory personnel exhibited intermittent failures and data errors. Typically, these would start around 10 a.m. On some days there were no failures.

A power monitor was installed at the panelboard serving the computer system. The monitor was connected, line-to-neutral (Channel A) and neutral-to-ground (Channel B). The recorded line-to-neutral waveforms were relatively undistorted sine waves, which gave no clues as to the source of the line disturbances.

An event summary of the RMS voltage, Figure 1, revealed a pattern of repetitive sags in the RMS voltage, beginning just after 10 a.m. The regular nature of these sags, as well as corresponding swells on the neutral, were made even clearer by increasing the resolution to a few minutes, Figure 2.

Computer on Shared Branch Circuit figure1
Figure 1
Computer on Shared Branch Circuit figure2
Figure 2

The regular repetition of the voltage sags was a powerful clue, indicating automatic switching of another load on the circuit. The neutral-to-ground waveform, Figure 3, indicated the load was linear.

A little more detective work soon located a laser printer in one of the nearby offices whose print fusing heater switched on every minute or so. The high current demand and resulting potential developed on the neutral was causing the computer errors. The printer was usually powered up around 10 a.m., after the user had created text to be printed. Moving the printer to another branch circuit removed the source of computer interference.

Computer on Shared Branch Circuit figure3
Figure 3

Manufacturing Process Unexpectedly Halted

Published by Dranetz – BMI Case Studies


This medium-sized manufacturing facility, located in an industrial park that experienced an unexplained shutdown of several adjustable speed drives (ASDs) , wreaking havoc on key process equipment. Each day, at approximately 6 am, the utility-owned PF capacitor kicks on to improve the voltage of inductive loads prevalent in many of the park’s manufacturing facilities. The ASDs are conditioned to anticipate this expected power quality event and are typically able to ride through the problem. So when one of the ASDs closed down and interrupted the continuous stream manufacturing process, the facility manager needed to learn why, correct the problem, and prevent it from happening again.

As you can see from the attached screen capture (Figure 1), a second, unanticipated capacitor switching event occurred shortly after the first. This event was categorized by the Signature System Capacitor Switching Answer Module, enabling the facility manager to pinpoint the exact source of the problem. Further analysis showed that the ASD shutdown was the result of an overcurrent trip, which was quickly remedied preventing hours of downtime, at a loss of $10,000/hour.

Manufacturing Process Unexpectedly Halted
Figure 1

Utility Power Factor Capacitor Bank Switch Problem

Published by Dranetz – BMI Case Studies


A medical clinic in Las Vegas, Nevada, employing sensitive computed tomography (CT Scan) system. Power was brought to the system from a 480 volt service feeding a 480-to-208 volt isolation transformer.

CT Scan system was experiencing repeated computer lockups and component failures.

The medical equipment service company installed a power monitor on site to analyze the power to the system. A single day of monitoring was enough to identify the case of the failures. Figure 1 shows the disturbance on the line caused by a utility power factor correction capacitor bank located just one block away.

Utility Power Factor Capacitor Bank Switch Problem figure1
Figure 1

Figure 2 shows the attenuation effect of the isolation transformer, still not enough to protect the CT Scan system from such a severe transient.

Utility Power Factor Capacitor Bank Switch Problem figure2
Figure 2

Expansion of the waveform data, Figure 3, revealed the ringing frequency of the system, when energized by the capacitor bank, was between 1 kHz and 1.5 kHz. This allowed the specification of a treatment device to mitigate the problem.

Utility Power Factor Capacitor Bank Switch Problem figure3
Figure 3

The medical equipment company recommended the use of an active-tracking filter specifically designed for this type of disturbance around 1 kHz. The filter was installed on the 480-volt line to protect all of the downstream equipment. Figure 4 shows the difference between the input (Channel C) and output (Channel B) of the filter during a subsequent capacitor bank switching operation.

Utility Power Factor Capacitor Bank Switch Problem figure4
Figure 4 – Input (Channel C)
Utility Power Factor Capacitor Bank Switch Problem figure5
Figure 4 – Output (Channel B)

 

 

Elevator Control Problem

Published by Dranetz – BMI Case Studies


Newly constructed condominium building in Westchester County, NY.

The condominium developer could not get the necessary permits for operation because the two building elevators would not run on the building’s emergency back-up generator. The problem was originally diagnosed as excessive voltage drop between the main service entrance in the basement and the tenth floor motor room. The technicians involved spent a lot of time and money trying to fix this presumed problem which had been incorrectly diagnosed. Among the solutions tried were: Adjustment of the transformer taps to +5 percent, replacement of the transformer with a model with a lower impedance model, and installation of an electronic tap switching regulator. A 450 kw emergency generator was even brought in for testing to see if it would be necessary to replace the existing 175 kw unit.

All of these attempts had some limited success, but none offered an acceptable solution.

A consultant used a power monitor to evaluate the quality of the voltage and current supplied to the elevator motor. Figure 1 shows the current swell during motor startup, while Figure 2 reveals the effect of the current demand on the voltage.

Elevator Control Problem figure1
Figure 1
Elevator Control Problem figure2
Figure 2

Using the power monitor was essential to uncover the real problem. Two factors became evident: First, the true RMS voltage reported by the monitor showed that the values measured by the less accurate average reading DVM’s were misleading. The actual voltage drop was not as severe as first indicated. Second, analysis of the current and voltage waveforms (both visually and using harmonic analysis) showed that harmonic distortion, not low voltage, was the real source of the problem, Figure 3. The level of the fifth and seventh harmonics in the voltage waveform was due to the reactance of the generator windings in response to nonlinear current demand from the elevator motor controller. A circuit in the motor controller was sensitive to harmonic distortion at these frequencies, mistaking them for a phase rotation error. The solution was achieved by replacing this circuit at a cost of a few dollars.

Harmonic Distortion of Current

Published by Dranetz – BMI Case Studies


Office building with personal computers, terminals, copiers, and other electric office equipment supplied by three-phase wye service.

Facility engineers at this site experienced repeated problems with the failure of electrical distribution equipment. A distribution transformer overheated and failed, circuit breakers were tripping, and electrical connectors were burning out. These problems are all symptomatic of overload conditions.

However, initial measurements of phase currents using a true RMS ammeter showed current readings of 257 to 298 amps. These values did not exceed equipment ratings. 

Impact of Thunderstorms

Published by Dranetz – BMI Case Studies


As the first thunderstorms of the season begin to roll through, it is important to safeguard your facility’s equipment against the significant damage that can be caused by the high frequency transient energy of lightning strikes. The first step is to make sure that you power monitor is up to the job and is capable of capturing these events. Unfortunately, many are not—here’s why. The term “transient” is now being defined in nearly every PQ monitoring equipment spec sheet to mean anything from a ¼ cycle drop-out to a sub-microsecond impulsive transient. According to IEEE, RMS variation are events that last longer than ½ cycle, leaving transients to be anything shorter than that. So, a typical instrument that samples the voltage at 128 times a cycle and triggers on an RMS variation will only capture the typical 1.2 x 50 microsecond lightning impulsive transient if it happens to occur during that sampling cycle. The odds of your monitor capturing such is at best, 33%.

Your odds go up significantly if your monitor has the ability to capture high frequency transients through either a 1MHz or faster sampling rate, or using high-frequency, reset-able dual peak detectors. Peak detectors incorporate high frequency circuitry into a peak-hold circuit that saves the largest magnitude value until it is reset. Provided that it is reset often, such as 128 times a cycle, it will capture that lightning-generated voltage transient and enable you to assess any impact to equipment.

Now we will evaluate the most common PQ occurrence during lightning storms and see how an effective monitor captures these events. In the following example, there were nearby direct or coupled lightning strikes to the electrical distribution wiring that feeds the facility. The facility relied on several surge suppressor strips, which contain TVSS (transient voltage surge suppressors) devices. These are components that are able to divert large amounts of energy into the ground conductor or phase-to-phase, away from the load, by radically lowering their impedance when the voltage tries to climb above a preset value.

When these TVSS devices work properly, the voltage level is clamped at a safe level, often under 250V peak for a 120V AC line. Many PQ monitors are set to 500V peak or higher for transient triggering, but when the lightning strike occurs and the TVSS works, the PQ monitor will not trigger. In this case, ignorance is not bliss as the strike did cause a significant current transient, meaning that the energy had to go somewhere. Fortunately, a PQ monitor that triggers on current transients using peak detectors will enable you to capture that data and evaluate the performance of the TVSS.

But why should you care about the event if the TVSS worked and the voltage was clamped, especially if there was no obvious equipment damage? Unfortunately, the TVSS was impacted slightly and each time it takes a hit, it loses some of its capability to divert the energy. Enough times, and the TVSS may fail. Then you have no protection, and you do not even know it. By monitoring for both current and voltage transients, you can see that the lightning transient did impact the electrical system, that the TVSS devices did their job, and determine if those devices are degrading and need to be replaced before a catastrophic failure. In other words, an effective monitoring instrument can be used to schedule maintenance in advance of devastating failures, optimize your mitigation equipment and maximize electric reliability.

Now let’s look at the data: Voltage A and Current C are upstream, whereas Voltage B and Current D are near the load. The first two figures show the voltage and current waveforms when there is no TVSS in the circuit. Not surprising, the 1038Vpk and 92A transient appears the same at both monitoring locations. The third figure shows a zoomed in version of the transients, with the fast rise and somewhat slower decay of the classic lightning impulsive transient.

The last two figures shows what happens when the same transient is generated into surge suppressor strip rated at 400V. Upstream from the device, the voltage is clamped to just over 400V but the current rises to 360A. Downstream, the voltage is under 400V and the current a mere 5A. Clearly, the device did its job, this time. But if the monitor had been set to 500Vpk trigger, the transient into the TVSS circuit would not have been captured without current transient triggering. With a 250Vpk TVSS, the probability of missing the event on a voltage-triggered monitor is greater, even with high-frequency transient voltage detection This data underscores the need for a monitoring instrument that can truly capture high-speed current transients before they capture your equipment.

Impact of Thunderstorms

Service Area Flicker

Published by Dranetz – BMI Case Studies


An entire service area of a Midwest facility. The utility was receiving complaints of annoying light flicker from an entire neighborhood. When the utility connected a power monitor to the 240V distribution bus the problem was quantified. The RMS Voltage event summary, Figure 1, indicates the bus voltage was essentially constant until a load was applied which caused the RMS voltage to oscillate between 228V and 242V.

Service Area Flicker figure1
Figure 1

Figure 2 shows 64 cycles of the 240-volt waveform during the disturbance period. It is almost impossible to analyze the small voltage variations from this diagram. Expanding the waveform around the peaks of the sine wave clarifies the situation.

Service Area Flicker figure2
Figure 2

In Figure 3, it is evident there are alternatively three low voltage cycles followed by three high voltage cycles, for a flicker frequency of 10 Hertz. This flicker frequency can be determined by properly positioning the cursors as shown here, or by simply dividing 60 Hertz by six.

Waveform expansion permits examination of peaks of cycles shown in previous figure. These are sine waves, although they do not appear to be so.

Service Area Flicker figure3
Figure 3

During this period, the voltage variation was approximately 4 volts. The ability of the power monitor to capture 64 cycles and to allow examination of peak amplitude changes by expanding the waveform made this analysis possible.

IEEE Standard 519-1981 indicates that human eye sensitivity to voltage flicker peaks at about 10 Hertz, thus accounting for customer annoyance.

Investigation revealed that the voltage variation was caused by a malfunctioning continuous welder within the service area. The welder was operating on an incorrect duty cycle: three cycles on, three cycles off.

Welder duty cycle was corrected so voltage variations did not create an annoying flicker frequency. 

Major Health Care Center

Published by Dranetz – BMI Case Studies


Severe power quality problems damaged X-ray equipment, costing $100,000 in one instance. The source of the problem was the switch over from utility to generator power, during regular testing and emergency situations. Figure 1(below) identified the cause of the problem, an out-of-phase transfer, captured by On Power with a Dranetz 658 Analyzer.

Major Health Care Center figure1
Figure 1

Ideally, an online UPS represents the best solution when protecting against low frequency / high energy events such as out-of-phase transfers (capacitor bank switching represent similar problems). The challenge was dealing with the size and shape of the inrush currents the X-ray demands as it cycles through its program (See Figure 2). Not only did current rise from 20 Amps to 100 Amps (380V system), but even harmonics with a THD of 65% were present. The added challenge was that this X-ray procedure represented “invasive” techniques as catheters are inserted into arteries, sometimes into the heart.

 

Major Health Care Center figure2
Figure 2

On power solution was based on four phases:

  1. Extensive X-ray system monitoring
  2. Solution research/simulation
  3. Post system installation monitoring
  4. Permanently installed Power Quality Monitoring with communication ability. By injecting current to compensate for the distorted waveform, the AIM Filter not only improves the quality of power to the X-ray, it lowers the stress on the UPS, lowers impedance placed on the system by the UPS, and improves the output THD to the rest of the systems distribution (See Figure 3).
Major Health Care Center figure3
Figure 3

Stalled Motors

Published by Dranetz – BMI Case Studies


In this case study, we look at an industrial customer with two 1250hp motors on a 4kV circuit, whose motors would not start. To determine the problem, we installed a Dranetz – BMI PP4300 at the motor input. The power monitoring instrument quickly identified the motor itself as the source of the problem. In fact, the motor start caused a deep sag to occur, which impacted the motor control circuitry and stopped the motor from starting. In effect, the motor was “shooting itself in the foot,” creating a cycle of non-performance.

The customer was presented with several mitigation options, including adding more capacity to the circuit, installing a constant voltage transformer, or installing an uninterruptible power supply (UPS) system. The customer selected the UPS option, which was installed to protect the motor control circuitry during motor start-up and verified using the PP 4300.

Inrush currents, such as those associated with motor starting can cause interaction problems with other loads. When motors are started they typically draw 6-10 times their full load, which can cause voltage sags. These events can dim lights, cause contactors to drop out, disrupt sensitive equipment, and as in our case study, affect the successful start of a motor. The use of a power quality monitor that can capture waveforms during long duration start-ups will be quite effective in characterizing and optimizing motor starts.

Stalled Motors


Light Flicker In An Office Complex

Published by Dranetz – BMI Case Studies


The second floor of an end unit of an office-condo complex in the Washington DC area. The office space consisted of a reception and meeting area, two private offices, a kitchen area, and a bathroom. The entire area was powered from a single three-phase 208/120V wye feed from a transformer bank located right below and outside the office.

A light flicker problem had been noticeable for several years. It was most visible in the bathroom and outside hallway. The source of the flicker was undetermined, though it was suspected to be the HVAC units on the roof, as there was an audible sound in the bathroom that accompanied the flicker.

The voltage and current of both phases were monitored at the breaker panel (which happened to be in the bathroom). The top two lines in Figure 1 are the line-to-neutral voltages of two of the three phases in the 208/120 wye circuit. The lower two lines are the current, with the one at 26 Amps corresponding to the 124 Vrms nominal voltage (referred henceforth as the Blue Phase). The voltage of the Blue phase varied between 118.3 and 126.3Vrms, while the current varied 23.4-26.8 Arms. The other phase shown (Black Phase), varied from 115.3V-123.3Vrms while the current varied 17.2-19.4 Arms.

Light Flicker in an Office Complex figure1
Figure 1

Light Flicker in an Office Complex figure2
.

Light Flicker in an Office Complex figure3
.

Voltage fluctuation is usually the cause of light flicker. The human eye is most sensitive around 8.8 Hz, where less than a 0.5% variation in the RMS value will be noticeable by most people. This is especially true with incandescent lights, which were found in the bathroom and hallway.

To determine the source of the voltage fluctuations, the variation in voltage and current were used to calculate approximate source and load impedances. The load impedance was fairly constant (5 ohms phase A, 6 ohms phase B), while the source impedance was changing significantly (0.4-5 ohms on both phases). This pointed to the source of the problem as being external to point of measurement, or back towards the source.

This could also be deduced by looking at the time plots and seeing that the current was changing very little during the voltage fluctuation. For a load side problem, the current usually changes significantly to produce the voltage variation. The change noticed in the current is nearly proportional to the change in voltage, which one would expect in a linear system. The voltage variation was so large that it was noticeable in the audible sound produced by the bathroom fan, which was mistaken as being the HVAC system.

Since the source of the problem was determined to be before the electric meter, the utility company was contacted to determine the source in their system.