Published by Tom Shaughnessy, Shaughnessy Consulting Services 208 Jasper Way, San Marcos, CA 92078 408-666-4009 Background Phase rotation is something that contractors and electricians routinely check during construction and installation of motors and UPS systems. In facilities with only one service, seldom does a rotation change require utility involvement. However, complications can and do ariseContinue reading “Beware Rotation Issues on Transformers”
Tag Archives: Case Studies
A PQ Case Study: At A Quartz Tube Factory in Wuxi China
Published by Qianlu Yan, Vice General Manager, Beijing Joint Harvest Science & Technology Co., Ltd. Terry Chandler, Director of Engineering, Power Quality Thailand LTD/Power Quality Inc., USA. E-mail: terryc@powerquality.org